请帮忙翻译!!!!!!!

来源:百度知道 编辑:UC知道 时间:2024/06/19 07:51:00
一、工程概况 Brief Introduction of the Project
二、工程施工管理组织机构设置
三、项目部成员及管理人员简历
四、主要施工技术人员及技术工人
五、投入主要施工机械、电器设备
六、施工工期控制
七、工程质量保证体系及技术措施
八、安全保证体系及技术措施
九、消防保证措施
十、环境保护措施
十一、文明施工措施
十二、服务配合措施
十三、施工平面布置
十四、主要施工方案

1, project general situation
2, engineering construction administrative organization organization interposes
3, the project member of headquarter reaches the handling crew resume
4, technician and technical worker being under construction mainly
5, throws into main construction machinery , electrical equipment equipment
6, the time limit for a project being under construction controls
7, project mass ensures that system reaches technology measure
8, safe conduct system and technology measure
9, fire control guarantee measure
10, environmental protection measure
11, civilized construction measure
12, serves the measure fitting
13, arrange
14, main construction of flat surface scheme being under construction