请高人帮着把一些电脑专业句子翻译为英文
来源:百度知道 编辑:UC知道 时间:2024/06/03 00:07:47
有点专业了。小女子英文水平也不是很好,望高人相助
目前刚注册才有积分25。就选了20贡献出来啦~!!
不难,不过你是一级,我对刚注册的缺乏信心,见了太多的好心帮助结果什么都不给,把问题关了就跑了。
The path selection of pole line is an important part in pole line construction in communication engineering design. It affects the economical efficiency, safe reliability, construction and maintenance. The topic puts up the concrete rules for the correct path selection of pole line and appropriate methods for positioning power pole of LOC to improve the economical efficiency and safe reliability. The path selection and power pole position is an important part in pole line design. It demands strong technicality, policy and practicality and determines the economic index, construction, function and maintenance. The position is also so and affects the cost and construction of pole line system and conveniency and security of line. The CAD of communication constructional pole line engineering can manage the process, construction cost and progress of pole line construction in convenience and normalized ways in order to improve the