Residential Building Projects: Building Cost indicators and Drivers
Abstract: Time and costs are considered to be substantial success factors of building construction projects. In Germany, early cost estimates are provided by multiplying the cost indicator with the gross floor area. When preparing these estimates, the question arises as to which specific具体 cost indicator费用显示 has to be selected? The relevant cost drivers provide guidance for this selection. Drivers show which parameters(参量) are the determinants for the selection of the project-specific cost indicators. However, currently these drivers are not known for building construction projects in the German-speaking region. The relevant cost drivers for residential properties in Germany are identified by using regression analysis. These drivers are the median floor height, the share of the ancillary area for services, the construction duration, and the compactness of the building. Of the four cost drivers, the median floor h

住宅楼宇工程:建筑成本指标和司机
摘要:时间和成本被认为是实质性的成功因素,建筑施工项目。在德国,早期的估计费用提供乘以成本指标与总楼面面积。在准备这些估计数字,由此产生的问题,以具体的具体的成本指标,费用显示已被选中?有关成本司机提供指导,为这个选择。司机显示哪些参数(参量)是决定因素,为选择具体项目的成本指标。不过,目前这些司机不为人所知,为建筑施工项目在讲德语的地区。有关的成本驱动因素为住宅物业,在德国是确定用回归分析。这些司机中位数楼的高度,所占的配套服务区,施工时间,以及紧建设。上述四个成本司机,中位数楼的高度,证明有最大的解释性意义。该方法证明是适合回答研究的问题。然而,一些理论上的有关司机因无法提供的性能正在研究之中。因此,这些司机都必须跟进和研究在今后的研究。详细资料应列入特别是关于材料,规划和建设过程中,和具体的数据,约各个层面的建设。

天书!

也许它认识我,但我不认识它。

专业翻译请致信summersun198@yahoo.com.cn