急用摘要翻译 谢谢了

来源:百度知道 编辑:UC知道 时间:2024/05/14 01:15:47
本设计主要进行了矿山立井建设的施工组织设计。在确定整体框架之后,先进行了对施工场地的各方面原始资料的查阅,进而根据国家各规范手册以及当地的实际情况进行施工组织设计. 本文介绍了顾桥南区回风井的水文地质条件,冻结法施工的施工组织管理,注浆技术方案等方面的施工工艺。其中,第一部分是对国内外立井井筒施工技术的现状进行分析,第二部分主要是对顾桥南区回风井的基本情况、井筒施工的准备、注浆和冻结施工的方案选择、表土段和基岩段的施工和管理以及施工过程的安全和质量保证作出了主要的设计和阐述。
关键词:冻结法 施工组织 立井井筒

The main design of a mine shaft building construction design. In determining the overall framework, the first conducted on the construction site in all aspects of the raw data available and then based on national norms of the manual and the reality on the ground for construction design. In this paper, Gu southbound area to the wind well hydrogeological conditions , To freeze construction of the construction organization and management, grouting technology programmes such as the construction process. The first part is the construction of domestic and foreign shaft technical analysis of the status quo, the second part of the main areas of the LAB southbound back to the basic ventilation shaft, the shaft of the preparation, grouting and freeze construction of the options, of topsoil And the bedrock of the construction and management of the construction process and the safety and quality assurance to the main design and elaboration.
Key words: freeze construction of organizations