把工作经验翻译成英语
来源:百度知道 编辑:UC知道 时间:2024/06/23 08:05:56
Enters the design institute work, namely participated in 45 ton hinge vehicle project which develops together with Beijing Scientific and technical university Car or machine with load Institute, mainly participated in the cab gauge board concrete arrangement, the transmission gearbox computation examined and covers the partial charts.Starts hundred ton rigid vehicle project developments in 07 years in November, the independence is responsible for the entire transmission gearbox part, including the basis vehicles situation shaping, contacts with the supplier, the evaluation technology agreement and following works completely.Later period key for always arranges the situation according to the vehicles to design the transmission gearbox the suspension part, the cooling part, the filter part and around the drive shaft and the attachment flange part and so on, and shoulders eliminates the external cooperation partial chart work.Consults the study modestly in the work to the senior, indep