翻译一段公司简介,专业词翻不了,不用管它

来源:百度知道 编辑:UC知道 时间:2024/06/19 05:10:14
现公司厂房达7000多平方米,生产线3台层压机,每月的生产太阳能电池板的产量是2MW。客户可以在网络上看到自己的产品的视频生产过程。
当今市场面临着原材料电池片紧缺的实际情况,我公司新规划设计2条50mw的生产原材料电池片的生产线。新厂房工程土建于8月份开工,10月安装,所有生产设备会在12月份备齐,安装。(硅切割机友日本进口)6条生产线。成立125mw的硅切片生产基地。层压机10条生产线。2009年春节开工。
新厂房成立总公司,注册自己达5000万人民币,厂房面积打30000多平方米。
看到你们机器翻的,心都冷掉了。还是我自己翻算了
The company currently has an area of more than 7000㎡ with 3 laminating machines. The Output of solar panels’ power is 2MW every month. Customers can watch the video of their products’ process on the internet.
For the shortage of the solar cells on the market, our company planed to establish 2 new production lines to produce solar cells. Each line is able to produce 50MW solar cells. The new building of the factory will be start in August and decorate in October. All the manufacturing equipment will be ready and fixed in December. The silicon cutting machine which imported from Japan will work on 6 lines to form a base of producing 125MW silicon chip. These production lines will start on the pe

The current company workshop is more than 7000 square meters. There are three 层压 machines in the production line. Each month's production of solar cell board is 2MW. The customers can see the video of the production process of their own products online.
Current market is in the situation of raw material battery piece scarce. Our company plans to design two 50mw production lines to produce raw material battery piece. The new workshop construction project will begin in August and installation will be in October. All production equipment will be ready in December and installed. (silicon cutter machine will be imported from Japan) 6 production lines. We will establish a 125mw production base of the silicon slice(硅切片). 10 production lines of 层压机. The production will start from 2009 Spring Festival.
The new workshop will establish a corporation. The registered capital is as much as 50,000,000RMB. The plant area is more than 30000 square meters.

Companies are now more