哪位高手帮忙翻译一下,谢谢了

来源:百度知道 编辑:UC知道 时间:2024/05/27 18:52:20
实践和研究表明,桩基传统设计存在很多不足①地基差异沉降大,桩顶反力集中;②传力路径复杂,基础底板内力计算值大,配筋多,厚度大;③桩的承载力发挥程度低,桩基传统设计造成很大的不必要的费用投入。针对上述不足,通过中外高层建筑桩基工程实例对比分析,得到一些有益的启示,供高层建筑桩基设计参考。

The practice and the research indicated that the pile foundation tradition design existence is insufficient①The ground unequal settlement is big, the head of pile reaction is centralized;②The power transmission way is complex, the foundation mat endogenic force predicted value is big, the reinforcing bars are many, thickness is big;③The pile supporting capacity display degree is low, the pile foundation tradition design creates the very big nonessential expense investment.In view of the above insufficiency, through the Chinese and foreign high-rise construction pile foundation project example contrastive analysis, obtains some beneficial enlightenment, for high-rise construction pile foundation design reference