装修 材料 类的英译中

来源:百度知道 编辑:UC知道 时间:2024/05/18 00:03:55
2.Zinc channel mounted 100mmthk partition c/w double layer gypsum board on each side,drywall plaster at joints in bare finishes

3.1200 X 600 X 50mmthk density of 40kg/m3 rockwool insulation within partition

4.a) W10' x Ht8' x 12mmthk fixed tempered glass panel in white spray paint on one side c/w u-channel for Server Rm.
b) W3' x Ht8'x 12mmthk clear tempered swing glass door in white spray paint on one side c/w patch fittings,force spring embedded on ground & stainless steel door handle for Server Rm

5.a) W3' x Ht8' re-con rosewood veneer ply door frame in selected stained finishes
b) W3' x Ht8' re-con rosewood veneer solid-core flush swing door in selected stain finishs c/w hinges,lever handle lockset

6.Fixed glass panel c/w 12mmthk clear tempered glass & re-con rosewood veneer ply in stain finishes
a)W1 1/2'x Ht8' panel
b)W3' x Ht8' panel

7.Semi-concealed wire s

2.Zinc在某种路线上移动增加100mmthk分开c是有关清水墙的在最低限度最后部分中连接处给每一方面涂上灰泥的w双倍层石膏板
3.在分开以内40kg/m3 rockwool绝缘情况的3.1200 X600 X50mmthk密度
4.在白色喷头中4.a W10'x Ht8'x 12mmthk固定的钢化玻璃镶板把c//w u-服务器Rm的途径画在一方面上..
c w补丁程序试衣力量春天有关一方面b) W3x Ht8'x12mmthk清楚回火的摆动玻璃门被在为服务器Rm地和不锈钢门柄上把嵌入白色喷头油漆
5.a W3x Ht8侦察在b) W3x Ht8侦察的有选择的沾污的最后部分中红木饰面薄板层门框红木饰面薄板连续除去齐平摆动门的果核被有选择的在中c w给污迹最后部分装上铰链的撬开柄lockset

2.Zinc在某种路线上移动增加100mmthk分开c是有关清水墙的在最低限度最后部分中连接处给每一方面涂上灰泥的w双倍层石膏板
3.在分开以内40kg/m3 rockwool绝缘情况的3.1200 X600 X50mmthk密度
4.在白色喷头中4.a W10'x Ht8'x 12mmthk固定的钢化玻璃镶板把c//w u-服务器Rm的途径画在一方面上..
c w补丁程序试衣力量春天有关一方面b) W3x Ht8'x12mmthk清楚回火的摆动玻璃门被在为服务器Rm地和不锈钢门柄上把嵌入白色喷头油漆
5.a W3x Ht8侦察在b) W3x Ht8侦察的有选择的沾污的最后部分中红木饰面薄板层门框红木饰面薄板连续除去齐平摆动门的果核被有选择的在中c w给污迹最后部分装上铰链的撬开柄lockset

给你个翻译地址
毕竟不是人工翻译的,里面有人工翻译
不太贵

2 锌行动的通道 100mmthk 分区每三 / — 双重层石膏板,drywall 块,在关节的裸完成 3.1200 X 600 X 40 公斤 / 立方米 rockwool 绝缘内分区 4.a 50mmthk 密度) W10 x Ht8 x 12mmthk 修复强化的玻璃面板中的 Server Rm.的一侧三 / w