另一段关于上海地铁的句子,高分求翻译!
来源:百度知道 编辑:UC知道 时间:2024/04/30 20:25:47
The priority of the ventilation air-condition system of Shanghai subway 7th line project is put temperature, humidity, air flow, smoke evacuation on emergency of station public areas under fully control, ensuring the comfortable temperature and ventilation of every station's waiting room. Meanwhile, all the inverter air conditioners should have conflagration mode, which enables ducts fully run with ignoring outer control signals when accident happens, so to provide essential fresh air for passengers and firemen and ensure the safe evacuation of passengers, and with function of smoke evacuation.
(时间有限,可能翻不是太好)
---老竹出品,绝对原创!
In the Shanghai subway 7 line projects ventilates air-conditioning system's duty is to the station public area in the temperature, the humidity, the wind speed, the accident operating mode discharges fume and so on to carry on the positive control, guaranteed that in each station waiting area the comfortable temperature and ventilates