汉译英(专业级的进)
来源:百度知道 编辑:UC知道 时间:2024/05/29 15:28:05
这是我写的中级职称论文的摘要,请人工翻译。别用机器来误导我啊。谢谢。
It is a key and difficult point to avoid tunnels to be loacage, while the substantial clause of self fire-proof function effencicy faliur for tunnel lining structure is effencicy faliur of lining construction joint and movement joint. The article is on contruction measures of joint-connection and fire proof for sing 01 single-hole levee of 4th line of Beijing Metro, which has the refering use for similar engineerings.
To prevent leakage of water is a tunnel tunnel a major focus, difficult, and the tunnel lining construction joints and waterproof slot failure is caused by water from the tunnel lining structure of the important reasons for failure. This article for the Beijing Metro Line 01 on the 4th hole marked drop interval joints waterproof construction measures for other similar projects with a reference value
好 了 啊!!我自己翻译的
Prevention of tunnel seepage water is a tunnel a major focus, difficult, and the tunnel lining construction joints and waterproof slot