桥梁翻译专业高手帮忙翻译下 后天答辩特别急!
来源:百度知道 编辑:UC知道 时间:2024/06/07 14:17:30
I. Overview Bridge: Bridge building is located at 3 River Jianou Jianou West Town, Sanmen County, the water inside the village, built across the River bridge site. Ground elevation of the bridge site for the 89.5 - 104.5m. Second, the major technical standards for road grading: two urban road; design speed: 30km / h; design live load: Road Ⅱ level three, the design outlined in 1, cross-bridge arrangement (EK37 +200--EK37 +600), 10 were inter - for 40m. 2, the main building materials concrete concrete for the main beam of C45 concrete C40 for C35 concrete cover for the Department of Liang Liang, C30 concrete for the pier cap, pile foundation, steel bridge deck pavement, steel strand, standard strength Design tensile strength: HRB400 steel: the main force for the components of reinforced steel bars HRB335: cover for the main beam and steel beam stirrups HPB235: for pillar, pile cap, bored piles and structural steel stirrups IV Liang Department, basic design and construction of the pro