cost accounting的一道题目解答
来源:百度知道 编辑:UC知道 时间:2024/05/05 00:21:47
What is the maximum amount that Speedy would be willing to pay per machine hour to relax the constraint?
Selling Price Cost Price Daily Demand Size
Product A $84 $44 2 8 cubic metres
Product B $52 $36 10 2 cubic metres
Product C $40 $33.60 30 .8 cubic metres
Product D $40 $30 10 1 cubic metre
Product E $4 $2.90 100 .2 cubic metres
The truck measures 12 metres long by 2 metres wide by 3 metres high.
Required:
How many of each product should be put on the truck for the best financial result? List the order in which the products should be loaded according to their profitability per constrained resource.
Profit per cubic meters=(Selling Price-Cost Price)/Size
Product A:$5/Cubic Meter
Product B:$8/Cubic Meter
Product C:$8/Cubic Meter
Product D:$10/Cubic Meter
Product E:$5.5/Cubic Meter
In order to gain the best financial result, the truck should be fulfilled begin with the product that of the most profit per cubic meter.Namely,Product D->Product B&C->Product E->Product A.【Answer to the 2nd Question】
The maximum capacity of the truck is:
Long*Wide*High=72 Cubic Meters
Considering the truck's capacity and daily demand, we should load:【Answer to the 1st Question】
Product D: 10 Unit-10 Cubic Meters
Product B: 10 Unit-20 Cubic Meters
Product C: 30 Unit-24 Cubic Meters
Product E: 90 Unit-18 Cubic Meters
And the expected financial result would be $915