又是翻译……拜托

来源:百度知道 编辑:UC知道 时间:2024/05/08 12:35:03
4.03.8.8 Adding Bituminous Material and Aggregate Screenings. If the
application of bituminous material or aggregate screening, or both, placed on any portion of the roadway is insufficient for the required results, the Engineer may direct the Contractor to make additional applications of one or all materials in accordance with these specifications.4.03.8.9 Correction of Defects. Omissions by the distributor or damage to the treated surface of any application shall be immediately repaired by hand patching.

4.03.8.8 增加含沥青的材料和合计的筛屑。 如果那
含沥青材料或合计的纱网材料的申请, 或两者的, 放置在任何车道的部分上对必需的结果是不够的,工程师可能指示承包商符合缺点的这些规格4.03.8.9 订正制造另外一或所有材料的申请。 经销商或任何申请的被对待的表面伤害的省略将立刻被手插线修理。