桩基施工计划投入施工人员136人,其中:项目经理一名,负责工程的全面工作;工程师一名,负责现场技术措施的制定和特殊情况的处理;技术员二名,负责现场技术措施的实施及监督检查;质量员一名,负责质量检查结果奖罚;安全员一名,负责现场安全生产制度的落实检查结果奖惩;资料员一名,负责施工技术资料收集整理;材料员一名,负责个总材料的采购和保管;计量员一名,负责现场计量仪器的保管、检查;测量员一名,负责现场轴线、桩位测量定位,其他工作人员根据工程情况进行调整。

Pile Foundation Construction plans to invest 136 construction workers, including : a project manager, responsible for the overall project; An engineer, responsible for on-site development and technical measures to deal with special circumstances; Two technicians, technical measures for the implementation and supervision and inspection of the scene; Members of a quality, quality inspection results for reward and punishment; Safety, a charge of the scene -- the results of the implementation of safety production systems; A member of information, technical data collected for construction; A member of materials, procurement and materials for a total custody; Members of a measured, responsible for the custody of the scene metering equipment, and inspection; A surveyor for the scene axis, pile measurements, based on the engineering staff of other adjustments.

The construction plan of a base is put into 136 constructors, among them: One project manager, is responsible for the overall