按生产计划和产品工艺配方----提前1~3天领料(有小料时提前加入)----分送烘箱预热。
写好生产现场指示牌;按要求穿戴好安全防护用品;
②按产品工艺配方要求给反应釜、过滤器通(断)热水加热;
③检查并打开釜真空、通风系统阀门,关闭吸排料、压缩空气阀门(但釜顶吸料阀2开至最大);
④合上主电源并依次启动:真空泵、空压机、通风机、计量装置(通讯监控系统)
⑤再次检查吸排料管路阀门是否通畅;检查温度表、真空表是否处于要求的工作状态,称重表清零;
⑥按产品配方要求从烘箱中取料并检查是否已溶化,将原料按加料顺序运送到生产现场;

Formula-based production planning and product leadership expected from 1 to 3 days in advance (by adding a small advanced materials) preheated oven-distributed. Finished production site signs; Required to wear safety supplies; Second, according to the requirements of reactor product formula. Filter links (broken) hot water heating; ③ vacuum vessel inspection and opened ventilation valves closed suction expected, compressed air valves (but Kettle Top suction valve opening to the largest 2); ④ matches followed by the main launch : vacuum pumps and power. Air compressor, fan, metering device (Communications Control System) ⑤ re-examine whether the suction pipe valve patency materials; check thermometers, vacuum gauge whether the work required in the state, weighing scale Reset; ⑥ milk products required by reclaimer from the oven and check whether it has melted and raw materials will be delivered to the production sequence by feeding site;