英语高手进来,小弟在线等

来源:百度知道 编辑:UC知道 时间:2024/05/27 08:41:28
帮忙翻译下面三段文章:
第一段:Initially V0 is zero,when the converter is turned on,the bulk capacitor will charge resonantly to twice Vin. The voltage can be as high as 750V if Vin happens to be at the peak high-line 265V condition(375V),The peak resonant charging current through the inductor will be many times greater than normal full load current.the inductor must be designed to be much larger and more expensive to avoid saturation.The boost shunt switch cannot do anything to prevent this and could be worse if turned on during start-up.

The inrush current and voltage overshoot during the start-up phase is intolerable.A fuse is not suitable, as it will blow each time the supply is turned on.

第二段: It is necessary for NSH lamp driver to examine process inspection,the aging and the electric inspection in more than one process.Inspection is divided in the process of about 10,and it will be examined.It shows a requirements and questions about the equipment of those each ins

第一段:
起初v0的是零,当转炉开启后,将收取的散装电容共振VIn或两次. 电压可高达VIn或钢芯铝绞线如果正好处于高峰高线265v(375v),高峰 谐振充电电流通过电感多次将大于正常电流电感满载必须设计 要大得多,也更昂贵,为了避免刺激饱和并联开关不能做任何阻拦, 如果弄得更糟期间可投产. 涌流和电压过度期间的起始阶段是intolerable.a导火线不宜 因为它将打击每次供应开启.
第二段:
有必要清洗灯司机审查过程检查、老化、电气检验以上 process.inspection分为过程约10,它显示了测评会并回答有关规定 这些设备在每次检查following.refer一个高度汰资料表纲要
第三段:
这时, 我们将交付虽然夹具的概述草稿, 零件被使用和电路形式不是为这个limited.Please 变动设计以便如果它可能使它便宜, 和这是所有right.(Give 我报告在that)Please 估计的情况下费用每个跳吉格舞describled 在附上板料请求书面..Estimate:Necessity..(Please 提到图画为细节和规格)

水平有限,翻译的可能有欠缺的地方,请见谅.

这时, 我们将交付虽然夹具的概述草稿, 零件被使用和电路形式不是为这个limited.Please 变动设计以便如果它可能使它便宜, 和这是所有right.(Give 我报告在that)Please 估计的情况下费用每个跳吉格舞describled 在附上板料请求书面..Estimate:Necessity..(Please 提到图画为细节和规格)