英语牛的帮帮忙

来源:百度知道 编辑:UC知道 时间:2024/05/16 00:12:52
帮我把下面这段文字翻译成英文好吗?拜托了,你可以帮找英语牛一点的同学或者朋友帮帮忙啊

施工项目进度控制是保证施工项目按期完成,合理安排资源供应、节约工程成本的重要措施.因此有必要对施工项目进度控制的各个方面进行分析研究,本文着重从施工项目进度控制的基本方法、措施、主要任务、影响因素、控制原理、具体实施以及检查分析等几个方面进行了较详细的阐述和分析,为进一步更好的实施施工项目进度控制提供了一些必要的看法和总结。

Construction item progress the control is assurance to start construction item according to the date complete, reasonable arrangement resources supply, economy the important measure of[with] engineering cost.therefore have a necessity to construction item progress control of each carry on analytical research, this text emphasizes from construction item progress control of basic method, measure, main mission, impact factor, control principle, concrete implement and check analyzed several etc.s to carry on to elaborate in detail more with analysis, start construction for the further better implement item progress the control provided some necessity of the viewpoint and the summary.