请问下面的句子如何翻译啊。谢谢啦

来源:百度知道 编辑:UC知道 时间:2024/05/14 08:51:55
1、设备安装位置工艺有预留的,以工艺预留为准。
2、仪表接线请对照产品说明书认真核实,确认无误后方可送电运行。
3、仪表柜接地电阻不大于4欧姆,可以与电气共地。
4、管线、支架、桥架等敷设由施工单位现场处理,材料消耗以实际发生为准。
都不是很正确啊

1、Equipment assembles the location handicraft there being the handicraft reserving , using reserved for certainty.
2、Appearance works a telephone switchboard asking contrast product specifications checking , affirming errorless rear carefully but delivery of current works.
3、Appearance chest ground connection electric resistance can not greater than 4 ohms, with together electric field.
4、From the unit in charge of construction, the scene treatment , material consume lay down such as pipeline , holder , crane span structure taking that reality happens as the criterion.

1, equipment assembles the location handicraft there being the handicraft reserving , using reserved for certainty.
2, appearance works a telephone switchboard asking contrast product specifications checking , affirming errorless rear carefully but delivery of current works.
3, 4 ohms of appearance chest ground connection electric resistance block of wood greater than, can with togethe