很急但也绝对要求质量和正确性的论文摘要翻译
来源:百度知道 编辑:UC知道 时间:2024/06/07 15:29:23
Hospital floor of the main users of the mobility of the sick and wounded, in the event of fire, their own evacuation capacity is weak, so will its threat to life and property, it required hospitalization floor evacuation design safe and reliable. Is the safe evacuation of persons from the building in case of rapid evacuation to a safe region, Indoor important timely transfer of goods and property, while reducing as much as possible the fire which caused casualties and property losses, for firefighters to provide favorable conditions for the fire protection. Therefore, it is necessary to conduct regular assessment of their examination and its reliability for effective evaluation. Based on the central part of a hospital floor study. used engineering calculation and simulation software regional fire suits, and other methods and tools for their safe evacuation of the reliability assessment price. Engineering calculations necessary for the hospital floor, the evacuation time for RSET 13.