有没有高手?环境工程汉译英
来源:百度知道 编辑:UC知道 时间:2024/05/17 23:28:37
设计的处理规模为5000m3/d。经过处理后,废水的COD、BOD、SS分别由40000mg/L、23000 mg/L、24000 mg/L下降到小于300 mg/L、小于100 mg/L、小于150 mg/L,达到(GB8978—1996)二级排放标准后排放。
废水处理工艺流程为:
离心机——集水池——厌氧发酵罐——混凝澄清池——
UASB反应器——竖流式沉淀池——CAST池
污泥处理工艺流程为:
污泥浓缩池——带式压滤机
工程总投资:2482.6万元,每吨水处理成本为:3.0367元,每吨水实现的净收益为:6元
怎么都是软件翻译啊?
建议用软件翻
This design considerate wine lees waste water high COD , high SS,high water temperature of characteristics, chose to use two classes to be disgusted with oxygen-like oxygen craft.Be disgusted with an oxygen segment among them for be disgusted with oxygen to ferment a bottle+rise a flow type to be disgusted with oxygen a dirty mire bed(UASB) a reactor, good the oxygen segment is a CAST activity dirty mire method craft.The line of the forerunner solid liquid separate, recovery the wine lees be an agriculture fertilizer, again through heat ferment(be disgusted with oxygen to ferment a bottle) respectively, medium ferment(UASB) to decline solution organic matter, in the meantime recovery in the process of ferment in creation of a great deal of Zhao spirit.But before UASB reactor constitution mix Ning clearness pond, then for insuring an enter of UASB reactor water of SS can't lead Gao with satisfy UASB normal stability circulate.Should craft not only satisfy the waste w