谁能帮我翻译这段话啊。。。设计用的。不要用软件啊。答好了。奖100啊。。。
来源:百度知道 编辑:UC知道 时间:2024/06/18 01:36:17
Adopted engineering quantity detailed list to account price 巳 to become in the engineering build the price along with the formation of our country market economy system inevitable trend.However the engineering of our country build price to be placed in 1 to turn a track stage currently, so build price to also exist in the engineering of present stage our country a lot of shortage of place.Go deep into to know amount of engineering the characteristics of the detailed list in this kind of case and in the application in the actual engineering particularly of importance.This time designed small rea 116# buildings to carry on engineering quantity detailed list and bid to quote to the first light of day of draw up.Combining this design passes engineering to build a price assurance a method currently to the our country of analysis and comparison our country tradition settle the sum account price mode of some weakness and adoption engineering quantity the detailed list account price of supe