明天要交了帮帮忙工程英语

来源:百度知道 编辑:UC知道 时间:2024/05/16 13:00:15
Significant features of the tunnel network include:
 40 km oftunnels (one, two and three lane); 31.5 km cut and cover, 8.5 km bored.
 5 km of depressq road entry and exit ramps.
 Three underpinned or supported structures
 Five crossings above or below existing MRT tunnels.
 12 ventilation buildings and 9 ramp ventilation structures.
 3 new and four reconstructed bridges
 21 re-configured surface street intersections
 A single control centre for monitoring the system
The tunnels pass through extremely variable geological formations ,and a variety of cut-and-cover and mining methods will be used in their construction. Longitudinal ventilation is provided by 12 ventilation buildings and 9 ramp ventilation structures.
Construction of the bored tunnels some 13 m to 14 m in diameter will mark another milestone in Singapore's tunnelling techn

隧道网络的重要的特征包括:
40 公里隧道(1,2 和3 条道); 31.5 公里削减并且行,8.5 公里有。
5 公里压下道路进入和出口斜坡梯。
支持的3 还是支撑结构? 高于或低于现有的MRT隧道5 横越。
12座通风大楼和9座斜坡梯通风建筑物。
3座新和4 座重建的桥
21个重新成形的表面街道十字路口
监控系统的一个单个的控制中心隧道通过极其易变的地质构造, 并且多种减少并且盖住和采矿方法将在他们建设内使用的无论什么。 长度通风由12座通风大楼和9座斜坡梯通风建筑物提供。 的隧道的建设大约13 米到直径14米将在新加坡挖隧道的技术方面标明另一个里程碑。 总的概念是对结构的4.3 深的隧道开沟工程体制在现有的重力下水道里拦截流动的穿过岛的深的隧道, 水泵站上游, 并且信道流动以重力对新集中污水处理工作策略上位于东南和西南沿海领域全部治疗渗漏的两 将被通过深的海洋排泄口管道卸进新加坡的海峡

显着的特点隧道网,包括:
 40公里oftunnels (一,二,三线) ; 31.5公里裁剪及封面, 8.5公里无聊。
 5公里的depressq道入出境斜路设施。
三下,或支持结构
五个口岸高于或低于现有的捷运隧道。
 12个通风的建筑物和9匝道通风结构。
 3个新的和4个重建桥梁
 21日重新配置面街交叉口
一个单一的控制中心监控系统
隧道穿过极变地质构造,以及各类裁剪及封面及采矿方法将被用于其建设。纵向通风系统是由12个通风的建筑物和9匝道通风结构。
施工钻挖隧道约13米至14米直径,将标志着另一个里程碑,在新加坡的掘进technology.4.3深层隧道污水收集系统
整体概念,是构建横贯深层隧道拦截流动在现有重力下水道,上游的抽水站,渠道和流向,由重力来两个新的集中式污水处理厂将位于东南和华南-西部沿海地区都经过处理的污水将通过出院深海排污渠管道进入海峡的新加坡