这里的otherwise怎么理解?帮帮忙,谢谢啦!

来源:百度知道 编辑:UC知道 时间:2024/05/17 21:03:37
是这段话:
The quantities given in the Bill of Quantities are estimated and provisional, and are given to provide a common basis for bidding. The basis of payment will be the actual quantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the priced Bill of Quantities, where applicable, and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract. The rates and prices of major materials (steel pipes, electromagnetic meters and valves) will be paid upon delivered to the site according to the related items in the Technical Specifications.
其中的otherwise在这里是什么意思?怎么解释?这是个什么结构?and otherwise到这句句尾是什么意思,谢谢帮忙啦!!

被屈服的数量的比尔被估计而且暂时的, 而且有提供一种共同的基础给竞标。 付款的基础将会是被命令而且实行的工作的真实量, 如承包商所测量而且查证在~手边工程师而且在比率评价和价格竞标在量的有定价比尔, 哪里可适用, 而且另外以如此的比率和价格当做工程师可能在契约的期限里面固定。 主要材料 (钢管、电磁的公尺和活瓣) 的比率和价格将会被支付一依照技术上的规格相关的项目递送到位置。
otherwise译为“另外”表词性,and otherwise也属于同类,译为“及另外的...”

给予的数量在条例草案中的数量估计和临时性的,并给予提供一个共同的基础竞标。根据付款将实际数量排列的工作,并进行衡量,承包商和核实工程师和价值的利率和价格的价格收购法案的数量,在适用的情况下,否则在这样的利率和价格为工程师可订定的合同条款。费率和价格的主要材料(钢管,电磁仪表和阀门)将交付后支付网站根据相关项目的技术规格。
otherwise译为“另外”表词性,and otherwise也属于同类,译为“及另外的...”