有谁会翻译土木工程专业英语

来源:百度知道 编辑:UC知道 时间:2024/05/21 19:25:54
Frequently,the foremost consideration is the overall cost of the structure. This is ,of course,a function of the costs of the materials and the labor necessary to erect them. 0Sgaem`
Frequently,however, the overall cost is affected as much or more by the overall YEj8S5"Su\
construction time since the contractor and owner must allocate money to carry out the construction and will not receive a return on this investment until the building is ready %= /)
for occupancy. As a result ,financial savings due to rapid construction may more than Mi/&f 
offset increased material costs. Any measures the designer can take to standardize the design and forming will generally pay off in reduced overall costs. ) *,5"CO

通常情况下,最首要的考虑因素是总的成本结构。这当然是一种功能成本的材料和必要的劳动竖立他们。 0Sgaem ? ` ?
但通常情况是,总的费用是受多或更多的整体YEj8S5 “苏\
施工时间,因为承包商和业主必须拨出资金进行建设和将不会收到这一投资回报率,直至建设准备%?=?? / )
对占用。其结果是,由于金融储蓄快速施工可能超过平方米的I / ?及F ? ?
抵消增加材料成本。任何措施的设计师可以采取规范的设计和形成,一般回报降低整体成本。