14. REBOUND HAMMER TESTING

Where required by the Contract, the Contractor shall provide a rebound hammer (Schmidt hammer) for the purpose of non-destructive testing of in-situ or precast concrete. The hammer shall be used in accordance with the recommendations contained in BS 8110.

15. TESTING OF PRETENSIONED BEAMS 先张拉横梁试验

Pre-tensioned beams shall be tested as follows: 先张拉横梁应按照如下实验

a) Any beam selected by the Employer/Engineer shall be subjected to a loading test.
The Contractor shall not proceed with a loading test until he has obtained the approval of the Employer/Engineer of the detailed arrangements. Beams shall be tested immediately after transfer of stress.
a)

b) The beam shall be supported on rigid supports at its design points of bearing and the upward deflection due to the prestressing force measured relative to a line joining these points. Test loads shall

14.回弹锤试验
凡所要求的合同,承包者应提供一个反弹锤(施密特锤)为无损检测原位或预制混凝土。锤应使用根据所载的建议。
15先张拉横梁试验
先张拉横梁应按照如下实验
a.任何选定的梁雇主/工程师应受到载荷试验。
承包者应不着手进行载荷试验,直到他已经获得了批准雇主/工程师的详细安排。梁应测试后立即转移的压力。
b.梁应支持刚性支持在其设计要点轴承和向上偏转由于预应力衡量相对界限为连接这些点。试验荷载应同样适用于在第三点中的跨度不少于10约等于阶段。值的试验荷载应所要求的合同或确定的雇主/工程师和须是拉应力弯曲的0.1倍的规定的最低立方体强度
在转移生产的底部纤维。但是,如果压应力
在弯曲达到的值为0.4倍,指定立方体强度,这一载入中不得超过。最高负荷将持续5分钟以上,并取消了不少于5大致相等的阶段。中期跨度挠度相对直参考线连接点的支持,应衡量每个价值负荷, 5分钟后移除负载。测试应再重复。
c.荷载应测量的精度百分之二或0.05吨,两者以较大,和挠度,精度 0.5毫米。
d.负载偏转图应绘制这些价值观,并应表现出没有明显的变化由直线和恢复不得少于百分之九十的最大挠度
e.其中任何束未能满足雇主/工程师根据规定的考试,应拒绝和所有其他梁演员在同一行的拒绝梁也应予以驳回,除非检测,费用由承包者,并发现令人满意。

回弹锤试验

如果合同要求,承包商需提供回弹锤(如施密特回弹锤)对原地或预先浇铸好的混凝土进行非破坏性试验。

先张拉横梁试验

先张拉横梁应按照如下步骤进行试验:
a)招标方/工程师选取的任何横梁应进行负荷试验。在未获准招标方/工程师的详细安排之前,承包商不得擅自进行负荷试验。负荷压力一转移就应立即对横梁进行检测。

b)由于所测量的预应力与连接各点的那条线有关,所以应将横梁固定在负载设计点和向上挠度的刚性支架上。 而且同样要在至少10个长度均等的段的第三跨点处进行负荷试验。负荷测试值应符合合同或招标方/工程师的要求;以致,在底部光纤位置可以产生是中转点特定的最小立方体抗压强度的0.1倍的挠度张应力。但是