翻译 管道方面 10
来源:百度知道 编辑:UC知道 时间:2024/05/26 07:50:14
For some bending tests, the measured ovalisation of the pipe, unloaded after the test, was larger than the Offshore Standard OS-F101 [11] prediction for ovalisation at maximum bending strain. This may be due to the DNV Offshore Standard OS-F101 (2000) b
Table 5.4 shows that for some bending tests the measured values for the ovalisation after unloading (fAB) were lower than the values according to the DNV Offshore Standard OS-F101 [11] formula at maximum bending (fMBS).
表5.4表明,小型挠度测试中的卸载后成椭圆形的测量值,低于在根据the DNV Offshore Standard OS-F101 [11]标准的最大弯曲公式中计算出的测量值。(晕…)
Part of these differences were the result of Equation (5.15) being a design formula predicting a “safe” value for ovalisation.
其差值可用等式(5.15)计算得出,该等式用于预测椭圆化的“安全”值。
Moreover, Equation (5.15) predicts ovalisation at maximum bending strain while measurements were performed after the bending test.
此外,等式(5.15)预测了在挠度测试后度量的基于最大弯曲应变的成椭圆形,
During unloading of the pipe, a reduction of the ovalisation occurred [29].
在管道的卸载过程中,成椭圆形缩减。
Ovalisation at maximum bending strain in the small scale reeling tests was not measured.
在小型的卷轴测试中基于最大弯曲应变的成椭圆形是没有规则的。
Ovalisation meters measuring ovality during the test were used in the full sca