中文翻译成英文,不要机器翻译的。谢谢

来源:百度知道 编辑:UC知道 时间:2024/06/25 15:49:11
3. 现在无法回答,需要对所有图纸进行计算,4天后答复你。现在大概估计只有一半能达到1/4" BSP threads
交样日期大概在35-40个工作日内
我们非常感兴趣。请问他们公司需要加工怎样的产品,如果可以是否能先提供一些资料给我们,方便我们确定是否有能力进行加工!
next size tooling:就开11/2寸模具好了!

I can't answer you until four days later after I finished calculating all the blueprints. Right now probably only one fourth can reach BSP threads estimated.

The turn-in date will probably be in 35 to 40 week days.

We're really interested. What kind of products does their corporation need manufacturing? If possible would you provide some data please? It'll be of great help for us to make sure if we'll be able to manufacture them.
next size tool: 11/2 inch mold will be ok.

I cann't give you an answer right now.i have to make a calculation about all the drawings,i can give you the answer 4 days later,i estimate maybe only half could reach one forth BSP threads
the delivery of the sample could be arranged from 35-40 working days
we are really interested.could you tell what kind of product you wanted to process?could you offer us some imformation about the product if possible,so that we can make sure wether we can proces