高手帮忙翻译Quality Control PLan,翻好了还有悬赏
来源:百度知道 编辑:UC知道 时间:2024/06/11 15:58:14
1. To be tested materials deposited planning, and materials received two suspense. Testing and certification 3. Materials handling, sorting Treasury temperature, humidity control accounts, and materials, inventory management card period, inventory control 4. Preparation, leadership materials, the materials 5. program settings, materials checks, Location 6. program settings, location, patch, Reflow 7. 8 appearance welding inspection. procedures set 10.PCBA assembly 11. installation of the substrate 12. Clean appearance , labeling Print / paste, on the panel, OQC, packaging, 13 logo. Connectors 14. materials handling and Classification of temperature and humidity control accounts, and materials, inventory management card period, inventory control 15. FIFO, handling, product categories and volume controls 16. Product protective control procedures, materials storage / library / withdrawn / 17 scrap the operating procedures. Feeding test norms Product surveillance and measurement control