急求翻译,过后加高分,谢谢!!!!!!

来源:百度知道 编辑:UC知道 时间:2024/05/26 14:50:23
通常是许多冬冷夏热,既无供热锅炉,又无供热热网,或热网供热时间短,不稳定,却又要求全年空调的暖通工程设计中优先选用的方案

这个定于从句应该怎么套????
不要电脑翻译的,谢谢。。。

Usually is many winter Leng Xiare, both non-heating boiler, and does not have heats the hot net, or the hot net heating time is short, is unstable, also actually requests the annual air conditioning to pass plan which warmly in the engineering design first selects .

Usually is many winter cold summer hot, since have never provide hot boiler, provided again hot hot net, or hot the net provide hot time be short, unsteady, but again request whole year the warm of the air condition engineering design medium have the initiative to choose to use of project

Usually is many winters cold summer hot, since didn't provide hot boiler, and then didn't provide a hot net, or the hot net provide hot time short, unsteady, the but again requests a whole year the warm of the air condition engineering a design in have the initiative to choose to use of project