关于设备安装坑的位置和投料口的尺寸,我们与A公司确认的结果如附近所示。对该结果,请贵公司给予确认。主要的变更如下:
1.安装坑的位置从左400mm移动至左6210mm。
2.投料口的尺寸为宽200mm×长400mm。

谢谢。

1. As for the location of the equipment installation pit and the size of the feeding hole, we have made confirmation with Company A, with the results indicated nearby. Please verify the same. Major modifications include:
1. The location of the installation pit is moved from left 400mm to left 6210mm.
2. The size of the feeding hold is W200mm X L400mm.

Thank you.

As to dimensions of equipment installation hole and feeding portal,results that we had confirmed with A showed as attachment. Please kindly to confirm it.Main changes are following:

1. Installation hole position moved from left 400mm to left 6210mm.
2. feeding portal dimension is 200mm(W) X400mm(L)

As for equipments install position and hurl of pit to anticipate oscular size, we confirm with A company of the result is shown as neighborhood.To should please give to confirm as a result.Mainly Be change as follows:
1.install the position of pit to move from the left 400 mms