4.2.4 Supply Chain Management
ZD were able to demonstrate good supply chain management processes and procedures as part of their quality management system. However they are limited in impact with material suppliers and this is a common issue for small to medium cable manufactures. Evidence of excellent customer delivery date performance was also made available for assessment. Overall ZD supply chain records were in place and readily available.

4.2.5 Capability
Capability mapping to BT needs has analysed 2 categories already supplied to BT 2nd category not supplied to BT but are already preparing the site to meet these needs. 81 out of 200 cable types could be supplied to BT.
No issue for First phase, Second phase resource prioritisation. Third phase engineering need to work closely with BT engineers.

4.2.6 Capacity
There is space in the factory for additional equipment and parts of the site are occupied by third parties that could be easily r

4.2.4供应链管理
ZD能够很好的演示做为质量管理系统一部分的供应链管理流程和步骤。然而在原料供应却有局限性毕竟对于从小型到中型的线缆制造商这是一
个普遍存在的问题。向顾客交货日期也是可以预计的。总的来说ZD供应链记录时随时可以被处理的。

4.2.5 产能
对于英国电信需求已经作了分析。两种已经向英国电信作了供给。第二种还没有供应不过正在准备工点来满足他们的需求。200种线缆类型中的
80种可以供给英国电信。
第一阶段没有什么要说的,第二阶段要准备资源,第三阶段施工时要与英国电信工程师紧密配合。

4.2.6容量
工厂里还有空间用于存放附加的设备,被第三方占据的站点那些部分可以很容易的腾出空间来存放东西。
现在,65%的设备再用,最大容量是: 产品最大容量/每月 电话线 183,000PKM 同轴线缆15,000KM ,网线30,000KM

4.2.7 csr
zd 有一个CSR 策略以及来源于OHS 18001 的H&S策略。计划和流程都要在该在的地方。不过H&S策略和环境保护以及进行能源节约流程的最终
日期不是4月8日。
环境-
虽然ZD没有iso 14001注册,现在他们却有一个环境管理策略,并且一些高级目标管理系统正在被完善。
劳动力标准
为雇工而制定的卫生设施、紧急情况处理计划&流程张贴到车间里