我是一毕业生 现急需对论文摘要进行英文翻译 请高手帮忙
来源:百度知道 编辑:UC知道 时间:2024/06/07 12:03:01
本施工组织设计根据工程施工合同及设计文件为依据进行编写。其作为主导施工的依据,编制时对目标工期、工程质量、项目管理机构设置、劳动力组织、施工场地的有效利用、施工进度计划控制、机械设备及周转材料配备、主要分部分项工程施工方法、安全保证措施、文明施工及环境保护措施、降低成本措施等诸多因素综合考虑分析,突出科学性及可行性,确保工程顺利进行。
关键词:组织设计; 管理措施; 施工部署。
Abstract: The construction work is the preparation of the design engineering and construction management of the two major elements of the process of combining with each other, is prepared to guide the construction of the entire process of construction as well as technical and economic documents, which works as the nature, scale, structure and complexity of the construction , Project and construction requirements of the region's natural economic conditions vary. Construction of a major role in the preparation of the organization is two-fold: First, the role of the argument. Technical, organizational and management tools on the book argues tender offer bid, construction and project construction quality of the three major objectives of the rationality and feasibility; Second, the commitment and the role of the offer. Of the tender documents put forward the request to make clear and specific commitment to the project contract needed to provide the owners of the conditions of consent