各位大虾,帮忙翻译下面的段子,有劳啦,在线等待!谢谢

来源:百度知道 编辑:UC知道 时间:2024/05/29 02:47:10
My plan is to develop a procedure for us to follow. Such as ECO (Engineering Change Order), MDA (Manufacture Deviation Authorization), Part number system, Drawing Control Documentation, Manufacture BOM and Warrantee BOM, Project Flow (VSM-Value Stream Mapping), Engineering Pilot, Manufacturing Pilot, etc. I also plan to have training class for my engineers for design and certification to improve their skills. It will take some time to implement all these procedure. Currently I have already introduced VSM, Engineering Pilot, and Manufacturing Pilot to some of my engineer staffs. To implement all the other procedure I will need the cooperation from the other departments. After Chinese New Year I will start call for a meeting with other departments to improve the situation

我们马上就要进行我的一个开发程序的计划。包括工程变更命令 ,制造偏差授权,编号系统,绘图控制文件, BOM和制造BOM的抵押品 ,项目流( VSM的价值流图) ,工程试验,生产试验等,我还计划有个设计和验证方面的培训班来培训我所需要的工程师,以提高他们的技能。这将需要一些时间来执行所有这些程序。目前我已经有了向量空间模型,工程试点,试验和制造这些方面的一些工程师人才在工作,,我还需要其他部门的合作来完成所有其他程序。农历新年后,我将开始要求与其他部门召开会议讨论方案,以改善现在的状况。

另外你这里的BOM不知道是不是物料清单的意思。

456+485456