跪求高手把这段话翻译成英文

来源:百度知道 编辑:UC知道 时间:2024/05/17 22:14:04
1、已技改替换资产原值4.6M,减值2.2M,主要是去年我公司对窑和水泥磨提产技改所替换淘汰的资产,2、其他闲置资产原值2.6M,减值为1.2M,主要是我公司矿渣烘干系统不需再使用。以上减值均已经过北京BU审批。该批资产处置后预计收入为0.08M,同时增加COI 0.08M。
请不要用金山快译,谢谢.
Original Cost原值 Impairment 减值 bottlenecking project技改 Beijing BU北京

1, has been technical innovation to replace the original value of assets 4.6M, impairment 2.2M, mainly last year, my company right kiln and cement mill capacity increasing technological transformation of the replacement of obsolete assets, two other idle assets original value 2.6M, impairment of 1.2M, mainly because my company's slag drying without re-use. Impairment of the above have been approved through the Beijing BU. After the seizure of assets disposed of the projected revenue for 0.08M, while increasing COI 0.08M.