译了这段六级必过,谢了

来源:百度知道 编辑:UC知道 时间:2024/05/15 17:08:46
Unless otherwise approved by the Engineer, construction of the bituminous surface treatment shall progress towards the source of aggregate screenings being applied. Where application of bituminous material begins at the end of a previous application of bituminous material, and when directed by the Engineer, the Contractor shall cover
the full width of the end of the previous application with building paper at least eighty (80) centimeters wide.

除非被工程师否则批准, 沥青表面治疗的建筑将进步往聚集掩护的来源是应用的。那里沥青材料的应用开始在沥青材料的一种早先应用的结尾, 并且由工程师指挥, 承包商将盖
早先应用的结尾的充分的宽度与大厦纸至少八十(80) 厘米宽。