The Contractor shall furnish and operate sufficient equipment, produce or purchase and make timely delivery of materials and organize his work so that his progress will be equivalent to at least five (5) kilometers per day of completed roadway for all classes of bituminous surface treatment. Work shall be commenced where the Engineer directs.
4.03.11 PROTECTION OF FACILITIES. All bridge handrails, curbs, road signs or other facilities shall be protected from splashing of the bituminous material.

承包经营,应提供足够的设备采购和生产,及时提供资料,组织工作,进度将至少相当于每日5公里公路建成各类沥青路面处理. 将开始工作,工程指挥.
1911年3月4日保障设施. 所有桥梁扶手、限制、标志或其他设施,应避免日后的沥青材料.