Tenant Improvement Close-Out/ Move-in Checklist

I. CLOSE-OUT
Construction/Engineering tasks:

0 Receive the tenant approved and signed construction documents and specifications.
0 Receive the allowable change orders billed to tenant and inputs data into JDEdwards as needed. (Refer to Reconciling Tenant Improvement Cost Sample document, Exhibit)
0 Submit final Reconciliation of Tenant Improvement Allowance to tenant including any appropriate adjustments.
0 Specify moving and other related tenant costs allowable under lease to be paid.
0 Receive final lien waivers, including subcontractor waivers, filed in the TI project file.
0 Receive the Certificate of Occupancy, or applicable permit, if required by the local municipality, and filed in the construction and lease files.
0 Receive the completed punch list and tenant acceptance sign-off.
0 Receive “as built” construction plans labeled and filed in plan room.
0 De

房客改良关闭淘汰/move-checklist
导关闭淘汰建筑/工程任务:0获得房客批准并签订施工文件及规格. 0获得许可变更订单帐单向房客和投入数据纳入jdedwards需要. (指调和房客改善成本抽样文件 展览)0提交最终和解房客改善津贴房客包括任何适当的调整. 0specify移动及其他相关费用,承租人可根据租赁要付出的. 0获得最后连战637.40包括分包637.40呈递钛项目文件. 0领取证书占用,或适用的许可,如需要由当地市政府 归档的建设和租赁的档案. 0接收完成拳打名单及房客验收签退. 0接受"建"施工图标记,并提出了计划室. 0交付执行验收房地函,并获得建筑师/空间规划师. 0证明书大量完成所必需. 0裁剪及分配办公室钥匙. 0裁剪及分发restroom钥匙. 0确保太空是机械和电气遗赠. 0更换门锁的要求. 0取代灯光在空间和任何损坏的天花板瓦片. 0接收空中平衡报告. 0楼更新指示牌并安装租套房标志.