采矿论文摘要翻译(急)

来源:百度知道 编辑:UC知道 时间:2024/05/30 15:15:08
在现目前大多数项目设计周期偏短,时间紧、任务急的情况下,通过加强施工图设计阶段的设计深度以及项目实施过程中设计的后期服务来弥补初步设计文件中的一些不足,不失为一种方法。另外,对于施工和建设单位根据自身多年现场经验提出的意见和建议,应虚心接受。希望能通过笔者在实际工作中的一点心得给同行们提供一种思路,以供参考。

Majority of item design periods are partial to currently now short, pass to strengthen construction diagram design depth and item designing a stage to carry out the empress designing in the process expect to serve to make up first step design some shortage within document under the time circumstance with tight and nasty task, don't lose for a kind of method.Moreover, opinion and suggestion put forward to the construction and the construction unit according to oneself several years' spot experience, should be ready to take advice to accept.A dessert hoping to pass writer in the middle of physically working must give to go together provide a kind of way of thinking to provide a reference.

At present, most of the projects are in the design of short-cycle, time, urgent task, by strengthening the working drawings at the design stage of project implementation, as well as the depth of the design process of design services at a later stage to make up for the preliminary design