2温度的控制和防止裂缝的措施
为了防止裂缝,减轻温度应力可以从控制温度和改善约束条件两个方面着手。
控制温度的措施如下:
(1)采用改善骨料级配,用干硬性混凝土,掺混合料,加引气剂或塑化剂等措施以减少混凝土中的水泥用量;
(2)拌合混凝土时加水或用水将碎石冷却以降低混凝土的浇筑温度;
(3)热天浇筑混凝土时减少浇筑厚度,利用浇筑层面散热;
(4)在混凝土中埋设水管,通入冷水降温;
(5)规定合理的拆模时间,气温骤降时进行表面保温,以免混凝土表面发生急剧的温度梯度;
(6)施工中长期暴露的混凝土浇筑块表面或薄壁结构,在寒冷季节采取保温措施;

2 controls of the temperatures and prevent°from the measure of the crack
For prevent°froming the crack, ease temperature should dint can from control the temperature and improve 2 of the stipulation condition to begin.
Measure that controls the temperature is as follows:
(1)The adoption improvement bone anticipates the class to go together with, use dry the rigidity concrete, 掺 the admixture anticipate, adding to lead spirit or an etc. measures to reduce the cement dosage in the concrete;
(2)Mix to match the concrete add the water or use the water to cool off crushed stones the since low concrete sprinkle to build the temperature;
(3)Reduce to sprinkle to build the thickness when hot day sprinkle to build the concrete, make use of to sprinkle to build the level to spread the heat;
(4)Lay the pipe line in the concrete, open into the cold water to reduce the heat;
(5)The provision is reasonable of dismantle the mold time, the air temperature d