高手翻译,在线等。

来源:百度知道 编辑:UC知道 时间:2024/05/24 12:28:52
自A公司东北角的分汽缸,沿北墙内侧向西约70米,采取低架管的形式到现有的马路东侧,折90度顺马路东侧向南约620米,到污水处理厂西南角的管桥架下,采取地下直埋的方式铺设;然后上A公司现有的桥架,沿桥架向西约150米处设一个分汽缸,向北与B公司现有的蒸汽管道对接;向西南沿桥架约110米和C原有的蒸汽管道对接。
急啊!!!!!!!!

From a A Corporation northeast corner's minute cylinder, along the northern wall inside to the west the approximately 70 meters, adopts the low frame tube's form to the existing street east side, folds 90 degrees along the street east side to the south the approximately 620 meters, to under the Sewage treatment plant southwest corner's tube bridge, adopts the way which underground buries straight to lay down; Then on a Corporation existing bridge, the approximately 150 meters place supposes a cylinder along the bridge to the west, to northern and B Corporation existing steam conduit docking; To southwest along bridge approximately 110 meters with C original steam conduit docking.